//= $postImages[0][0]; ?>
23
One-year review of the construction works of the Rail Baltica International Station construction near the “Riga International Airport” 30.06.2022
Photos
//= $postImages[0][0]; ?>
23
One-year review of the construction works of the Rail Baltica International Station construction near the “Riga International Airport” 30.06.2022
//= $postImages[0][0]; ?>
46
Development of the detailed technical design for Rail Baltica Salaspils Intermodal Freight Terminal launched 17.06.2022
//= $postImages[0][0]; ?>
54
Exhibition opening “With one train in tomorrow” – Bauska 10.06.2022
//= $postImages[0][0]; ?>
11
Signing of the Memorandum of Cooperation 05.09.2019
//= $postImages[0][0]; ?>
8
Official signing of the Latvian central section design contracts 08.07.2019